Acebes F, Pajares J, Galán JM, and López-Paredes A (2013) Beyond earned value management: A graphical framework for integrated cost, schedule and risk monitoring. Procedia-Social and Behavioral Sciences 74(1):181-189.
Acebes F, Pajares J, Galán JM, and López-Paredes A (2014) A new approach for project control under uncertainty. Going back to the basics. International Journal of Project Management 32(3):423-34.
Acebes F, Pereda M, Poza D, Pajares J and Galán, JM (2015). Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques. International Journal of Project Management 33(7):1597-1609.
Acebes, F, Pajares, J., Galán, JM, and López-Paredes, A (2016) A project monitoring and control system using EVM and montecarlo simulation. Project Management and Engineering Research 4(1): 31-40.
Ahmad L,
Aslam M, and
Jun CH (2014) Designing of X-bar control charts based on process capability index using repetitive sampling. Transactions of the Institute of Measurement and Control 36(3):367-374.
Aliverdi R, MoslemiNaeni L, and Salehipour A (2013) Monitoring project duration and cost in a construction project by applying statistical quality control charts. International Journal of Project Management 31(3):411-423.
Anbari FT (2003) Earned value project management method and extensions. International Journal of Project Management 34(4):12–23.
Aslam M,
Azam M
, and
Jun CH (2015) A new control chart for exponential distributed life using EWMA. Transactions of the Institute of Measurement and Control 35(2):205-219.
Băncescu M (2016) Controlling Project Schedule Progress, Using Control Charts. Cybernetics and Systems 47(7): 602-615.
Bauch GT, and Chung CA (2001) A statistical project control tool for engineering managers. Project Management Journal 32(3):37–44.
Burke R (2003) Project management planning and control techniques 4thed.
Chen HL (2014) Improving forecasting accuracy of project earned value metrics: linear modeling approach. Journal of Management in Engineering 30(2):135-145.
Cioffi DF (2006) Designing project management: a scientific notation and an improved formalism for earned value calculations. International Journal of Project Management 24(2):136–144.
Colin J and Vanhoucke M (2014) Setting tolerance limits for statistical project control using earned value management. Omega 49(1):107-122.
Colin J and Vanhoucke M (2015) Developing a framework for statistical process control approaches in project management. International Journal of Project Management33(6): 1289-1300.
Fleming QW and Coppelman JM (2005) Earned value project management 3th ed. Project Management Institute.
Henderson K (2004) Further developments in earned schedule. The Measurable News 1(1):15–22.
Leu SS and Lin YC (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management-ASCE 134(10):813–819.
Leu SS, Lin YC, Chen TA, and Ho YY (2006) Improving traditional earned value management by incorporating statistical process charts. Proceedings of ISARC, 275-280.
Lipke K (2003) Earned schedule: a breakthrough extension to earned value theory? A retrospective analysis of real project data. The Measurable News 1(2):13–23.
Lipke W (1999) Applying management reserve to software project management. Journal of Defense Software Engineering 17–21.
Lipke W (2002) A study of the normality of earned value management indicators. The Measurable News 4(1):1-16.
Lipke W (2011) Earned schedule application to small projects. PM World Today 13.
Lipke W and Vaughn J (2000) Statistical process control meets earned value. The Journal of Defense Software Engineering 13(6):16–20.
Lipke W, Zwikael O, Henderson K, and Anbari F (2009) Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management 27(4):400-407.
Lombard P. (2007) Project scheduling and cost control: Planning, monitoring and controlling the baseline. Project Management Journal 39(2):115-115.
Marrero M Fonseca A, Falcon R, and Ramirez-de-Arellano A (2014) Schedule and cost control in dwelling construction using control charts. The Open Construction and Building Technology Journal, 8(1):63-79.
Martin EB and Morris AJ (1996) An overview of multivariate statistical process control in continuous and batch process performance monitoring. Transactions of the Institute of Measurement and Control 18(1):51-65.
MoslemiNaeni L and Salehipour A (2011) Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Systems with Applications 38(7):8193-8198.
MoslemiNaeni L, Shadrokh SH, and Salehipour A (2011) A fuzzy approach for the earned value management. International Journal of Project Management 29(6):764–772.
Nedumaran G, Pignatiello Jr, and Calvin JA (2000) Identifying the time of a step-change with χ2 control charts. Quality Engineering 13(2):153-159.
Noori S, Bagherpour M, and Zareei A (2008) Applying fuzzy control chart in earned value analysis: a new application. World Applied Sciences Journal 3(4):684-690.
Pajares J and Lopez-Paredes A (2011) An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index. International Journal of Project Management 29(5):615-621.
Quesenberry CP (1991) SPC Q charts for start-up processes and short or long runs. Journal of Quality Technology 23(3):213-224.
Runger GC, Alt FB, and Montgomery DC (1996) Controlling multiple stream processes with principal components. International Journal of Production Research 34(11):2991–2999.
Twigg PM and Thomson M (1995) On-line noise estimation for adaptive SPC loop control Transactions of the Institute of Measurement and Control 17(3):112-119.
Wang D and Romagnoli JA (2005) Generalized T distribution and its applications to process data reconciliation and process monitoring. Transactions of the Institute of Measurement and Control 27(5):367-390.
Wang Q, Jiang N, Gou L, Che M, and Zhang R (2006) Practical experiences of cost/schedule measure through earned value management and statistical process control. Software Process Change 348-354.
Wei NC, Bao CP, Yao SY and Wang PS (2016)Earned value management views on improving performance of engineering of engineering project management. International Journal of Organizational Innovation (Online) 8(4):82-93.
Zheng QB and Bi X (2013) Optimization on earned value method combined with critical path. In Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation Springer Berlin Heidelberg, 707-715.