Real-Time Building Information Modeling (BIM) Synchronization Using Radio Frequency Identification Technology and Cloud Computing System

Document Type : Research Paper

Authors

Department of Mechanical Engineering, Eastern Mediterranean University, Famagusta, KKTC, Via 10 Mersin, Turkey

Abstract

The online observation of a construction site and processes bears significant advantage to all business sector. BIM is the combination of a 3D model of the project and a project-planning program which improves the project planning model by up to 6D (Adding Time, Cost and Material Information dimensions to the model). RFID technology is an appropriate information synchronization tool between the real and virtual world of BIM. Also, the use of cloud storage and computing system, would bring about outstanding data access capabilities to the constructors as well as other project participants.
The accurate prediction power that BIM brings to construction management and real-time status update, while utilizing the RFID technology, would greatly influence the efficiency of automated project management and post construction life-cycle maintenance. Meanwhile, cloud system will facilitate broad data transaction capabilities with the project. Hence, these integrations would enhance construction management by improving the data communication speed, real-time construction site control process and Human Resource Management as well. This paper introduces and evaluates a framework, which integrates Radio Frequency Identification (RFID) technology for real-time, mobile construction-site monitoring through a virtual model (BIM) and cloud data sharing as well as for processing activities. A case study has been carried out in the construction site of a new dormitory in Eastern Mediterranean University to examine different feasibilities and limitations of the framework.

Keywords

Main Subjects


Adetunla, A. O., Barenji, A. V., & Barenji, R. V. Developing manufacturing execution software as a service for small and medium size enterprise.
 
Barenji, A. V., Barenji, R. V., & Hashemipour, M. (2013, June). Structural modeling of a RFID-enabled reconfigurable architecture for a flexible manufacturing system. In Smart Objects, Systems and Technologies (SmartSysTech), Proceedings of 2013 European Conference on (pp. 1-10). VDE.
 
Barenji, A. V. (2013). An RFID-based distributed control system for flexible manufacturing system (Doctoral dissertation, Eastern Mediterranean University (EMU)-Doğu Akdeniz Üniversitesi (DAÜ)).
 
Barenji, A. V., & Degirmenci, C. (2015, January). Robot Control System based on Web Application and RFID Technology. In MATEC Web of Conferences (Vol. 28). EDP Sciences.
 
Barenji, A. V., Barenji, R. V., & Hashemipour, M. (2016). Flexible testing platform for employment of RFID-enabled multi-agent system on flexible assembly line. Advances in Engineering Software, 91, 1-11.
 
Barenji, R. V., Barenji, A. V., & Hashemipour, M. (2014). A multi-agent RFID-enabled distributed control system for a flexible manufacturing shop. The International Journal of Advanced Manufacturing Technology, 71(9-12), 1773-1791.
Dikaiakos, M. D., Katsaros, D., Mehra, P., Pallis, G., & Vakali, A. (2009). Cloud computing: Distributed internet computing for IT and scientific research. IEEE Internet computing, 13(5), 10-13.
 
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013). BIM implementation throughout the UK construction project lifecycle: An analysis. Automation in Construction, 36, 145-151.
 
Eastman, C., Eastman, C. M., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wiley & Sons.
 
Goedert, J. D., & Meadati, P. (2008). Integrating construction process documentation into building information modeling. Journal of construction engineering and management, 134(7), 509-516.
 
Howell, I., & Batcheler, B. (2005). Building information modeling two years later–huge potential, some success and several limitations. The Laiserin Letter, 22, 4.
 
Meadati, P., Irizarry, J., & Akhnoukh, A. K. (2010). BIM and RFID integration: a pilot study. Advancing and Integrating Construction Education, Research and Practice, 570-78.
 
Ren, Z., Sha, L., & Hassan, T. M. (2007). RFID facilitated construction material management-a case study of water supply project. In Proceedings of the 24th CIB W78 Conference Information Technology in Construction, Maribor, Slovenia (pp. 401-406).
 
Jardim-Goncalves, R., & Grilo, A. (2010). SOA4BIM: Putting the building and construction industry in the Single European Information Space. Automation in Construction, 19(4), 388-397.
 
Penttilä, H. (2006). Describing the changes in architectural information technology to understand design complexity and free-form architectural expression.
 
Zhang, Q., Cheng, L., & Boutaba, R. (2010). Cloud computing: state-of-the-art and research challenges. Journal of internet services and applications, 1(1), 7-18.
 
Varkonyi, V. (2011). Debunking the Myths about BIM in the ‘Cloud’. AEC bytes, 1-4.